Jekko distributes and exports its mini cranes across every continent through a global network of over 40 official dealers, trained and continuously updated on the latest product developments. Each dealer serves as the local point of contact for Jekko customers, offering pre-sales consultancy, technical support, and warranty management in line with the parent company’s standards. A network designed to make every stage of the product experience simple, anywhere in the world.
Three Jekko Mini Cranes Working Together for Complex Industrial Installations
When limited floor load capacity, low ceilings and structural obstacles make larger cranes impractical, compact lifting solutions make the difference.
During the construction of a new multi-storey automotive components factory, Dzwigniemyto Lewandowski deployed three Jekko mini cranes, including SPX532 and SPX532.2 models, operating simultaneously to install both structural steel elements and production equipment.
Working on the upper floors presented significant challenges due to limited floor load capacity, low ceilings and restricted operating space. Numerous horizontal and vertical steel structures at different heights created additional obstacles, requiring the cranes to carefully manoeuvre their booms and loads through narrow gaps.
Thanks to their compact dimensions, all three cranes could operate simultaneously in confined areas without interfering with each other.
Their long reach also proved essential for positioning production equipment in areas far from the cranes' operating positions, where direct access was impossible due to existing machinery or other ongoing construction activities.
This application demonstrates how compact dimensions, long reach and precise load handling make Jekko mini cranes an effective solution for complex industrial installations, even in the most challenging working environments.
Behind the scenes at Barcolana: a Jekko SPX532.2 builds the Village on Trieste's waterfront
Every year, Barcolana transforms Trieste into one of the world's leading international sailing stages, attracting crews, enthusiasts and visitors from all over the world. It is not only the world's largest sailing regatta – with more than 2,000 boats and around 300,000 spectators expected – but an event that involves the entire city for several days, bringing together sailing, tourism, business and entertainment along Trieste's waterfront.
And it is right here, on the seafront next to Piazza Unità d'Italia, that the Barcolana Village takes shape: a true temporary city made up of exhibition stands, hospitality areas and spaces dedicated to the public, forming the beating heart of the event.
Within this setting, an HLI Rent Jekko SPX532.2 was involved in assembling part of the Village structures on behalf of Central Serramenti, a company belonging to Edil Group. HLI Rent supported the installation of the temporary structures, focusing in particular on handling glass panels, railings and metal pergolas, as well as lifting equipment intended for the interior spaces of the exhibition containers.
The working environment made the job particularly challenging: limited space and uneven ground, several teams operating simultaneously, tight installation schedules and a worksite directly overlooking the sea.
Hook, vacuum lifter and hydraulic jib: millimetre precision
Simone Ravalico, HLI Rent Technical Sales Specialist, explains:
“To handle the different operations, the SPX532.2 was used both with the hook for steel structures and with a vacuum lifter for the installation of more than 30 glass panels, always in combination with the hydraulic jib. The possibility of adjusting the jib offset angle proved extremely useful, allowing us to adapt the working geometry with great precision and guide the materials with millimetre accuracy, not only at height but also right inside the Village’s container structures. During the installation days, moderate Bora winds were also blowing, a typical feature of Trieste that must always be carefully considered when planning lifting operations, especially when handling large elements such as glass panels.”
Compactness and speed against the clock
Simone Ravalico adds:
“This is the first time a mini crane has been used for this type of work, which would normally be carried out using truck-mounted cranes. In such a congested area, however, the mini crane proved to be the most practical and efficient solution: thanks to its compact dimensions, it allowed us to work close to the structures and in the tightest spaces, while also enabling several teams to operate simultaneously without interfering with one another.”
The combination of the SPX532.2, dedicated attachments and the experience of HLI Rent’s operators made it possible to speed up operations, reducing installation times compared with the original schedule. This was particularly important for an event with a fixed opening date that could not be postponed.
At the end of Barcolana, the same SPX532.2 will return to Trieste’s waterfront for the dismantling of the Village.
Between Piazza Unità d’Italia and the Adriatic Sea, the Jekko mini crane is therefore working behind the scenes of Trieste’s most important event of the year. Because before the show begins on the water, someone has to prepare everything that happens on land.
Discover Jekko SPX532.2, the tracked telescopic mini crane behind this project.
Jekko and NMG Italia join forces for a high-altitude challenge in the Dolomites
For a highly complex alpine construction site, Jekko and NMG Italia provided the most compact and efficient solution: the SPX328 mini crane, airlifted to altitude by helicopter.
In mountain construction, jobsite logistics management is often one of the main operational challenges. A clear example is the project commissioned by the Municipality of La Villa, in Alta Badia, and entrusted to Nagler Holzbau Srl for the construction of a new mountain hut near the Rifugio Gardenacia, in the heart of the Puez-Odle Nature Park.
A sustainable mountain hut in the heart of the Dolomites
Located at 2,050 metres above sea level and reachable only on foot, the new hut, roughly 80 m², was built using high-efficiency prefabricated wooden modules, designed to blend harmoniously into the Dolomite landscape. Thanks to the prefabricated modules and the support of Jekko's SPX328 mini crane in handling and placement operations, jobsite activities were optimised: most of the perimeter structure was completed in just a few hours, while the entire building was delivered turnkey in under a week.
Compact technology for special applications
To operate in this logistically challenging environment, Nagler Holzbau turned to NMG Italia, which identified the ideal lifting solution for the site's specific needs: the Jekko SPX328 tracked mini crane.
"Finding the optimal solution for this specific case was the cornerstone of the project," explains Stefano Vecchiato, project manager at NMG Italia. "We chose the SPX328 because it's compact, versatile, agile and intuitive to use, and because it was designed for quick disassembly into lightweight components that can be transported by helicopter or light vehicles.
To keep helicopter usage time to a minimum and reduce logistics costs, as well as on-site working time, we carefully planned the crane's disassembly procedure, component balancing and subsequent reassembly at altitude."
NMG Italia and Jekko: a winning partnership
The Rifugio Gardenacia project is a concrete example of how collaboration between different areas of expertise can create value on the most complex jobsites. NMG Italia's technical team was supported by Jekko's after-sales team throughout the various work phases, starting with the disassembly of the SPX328 at NMG's headquarters in Verona: the telescopic boom was removed first, with controlled disconnection of the hydraulic and electrical systems, followed by the four stabilisers and finally the lithium battery pack and accessory materials.
Next came preparation for the flight: the crane was divided into four macro-blocks, each within the 1,000 kg limit, perfectly balanced and ready for helicopter transport to the alpine site, a journey that took only a few dozen minutes in total.
Reassembly took place at altitude in reverse order, following a mirrored logic: first the battery, then the stabilisers and finally the telescopic boom.
The result was a fast and efficient operation, confirming the value of an established collaboration even in the most challenging operating environments.
The key role of Jekko's after-sales service
"These projects really show what technical assistance means today," comments Igor Pachera, Jekko's After Sales Manager. "Our partners, like NMG Italia, are extremely skilled and technically qualified. Thanks to interlocutors like these, Jekko's after-sales role becomes more consultative: supporting the customer through every operational and planning phase, especially when conditions become extreme."
Logistics as a competitive factor on remote jobsites
Projects like Rifugio Gardenacia highlight a growing trend in high-altitude construction: jobsite logistics is no longer just a support activity, but a strategic element that can determine the success of an entire project.
On remote jobsites, where operational windows are often limited by weather conditions and environmental constraints, the ability to efficiently plan the transport of materials and equipment becomes a decisive competitive factor.
In this scenario, choosing technology designed to operate in difficult conditions reduces time, complexity and operating costs, opening up new possibilities for building in locations that, until a few years ago, were considered particularly difficult to reach and manage.
NMG Italia and Jekko have proven ready to take on the challenges of remote jobsites.